Summary
Overview
Work History
Education
Skills
Academic Background
Work Experience
Fecha Actualizacion
Personal Information
Languages
Timeline
Generic
Fernando José Möller Roth

Fernando José Möller Roth

Santiago

Summary

Solutions-oriented engineering professional with strong understanding of product development process. Brings excellent interpersonal and communication skills to work effectively with colleagues, management and vendors. Proactive in identifying areas of improvement and taking steps to drive successful completion of projects.

Experienced in designing, developing and implementing cost-effective and energy efficient mechanical systems.

Overview

22
22
years of professional experience

Work History

Senior HVAC Engineer and Partner

Vibraled Inversiones
08.2021 - Current
  • Streamlined project management processes by coordinating with contractors, suppliers, and stakeholders to ensure timely completion of projects within budget.
  • Improved system efficiency by designing and implementing advanced HVAC solutions for commercial projects.
  • Reduced energy consumption with the optimization of heating, ventilation, and air conditioning systems in various facilities.
  • Mentored junior engineers in the development of their technical skills as well as effective communication with clients, team members, and vendors.
  • Provided expert consultation on energy-efficient technologies and best practices for new construction projects.
  • Designed custom HVAC layouts for complex building structures, ensuring optimal performance and costeffectiveness.
  • Conducted thorough inspections and diagnostic analyses of existing HVAC systems, identifying areas for improvement and recommending upgrades.
  • Coordinated commissioning activities during project closeout phases to verify proper installation, functionality, and performance of installed HVAC systems.
  • Spearheaded retrocommissioning efforts to improve the overall performance of aging HVAC systems in commercial buildings.
  • Performed detailed load calculations to determine accurate equipment sizing for various applications.
  • Collaborated with multidisciplinary teams to develop innovative HVAC designs that met project requirements and exceeded client expectations.
  • Developed comprehensive plans for the replacement or upgrade of obsolete HVAC equipment, including budgeting, scheduling, and coordination with maintenance personnel.
  • Designed HVAC systems and specified components for successful installation and operation.
  • Conducted safety analyses and hazard evaluations for systems.
  • Repaired and installed split systems, chillers and boilers.
  • Helped maintenance and building engineers make accurate assessments and repair plans for HVAC systems.
  • Promoted positive solutions for preventive maintenance, equipment repair and component fabrication to match specifications.
  • Developed instrument diagrams, formal calculations and equipment datasheets.
  • Coordinated with engineering group and other disciplines to develop new system designs.
  • Interpreted blueprints, technical drawings, schematics and computer-generated reports for new product development.
  • Drafted assemblies, models, and other technical drawings.
  • Designed budgets and cost estimates for projects with speed and accuracy while working closely with clients, drafters and employees to determine best courses of action.
  • Examined existing documents and blueprints to best update and maintain project records.
  • Specified system components and directed product modifications to comply with engineering design and performance specifications.

HVAC Construction Manager

Farenhouse Energy Group
12.2020 - 07.2021
  • Supervised team of 25 construction workers to maintain productivity and quality of work.
  • Oversaw successful completion of multiple projects simultaneously, prioritizing tasks based on urgency and importance.
  • Identified and resolved construction issues promptly to prevent delays.
  • Communicated daily with vendors to keep project fully operational.
  • Completed projects within time constraints by effectively managing schedules and allocating resources.
  • Collaborated closely with clients to ensure project objectives were met, maintaining transparent communication throughout the process.
  • Established a reputation for excellent crisis management skills when unexpected issues arose during construction, quickly developing solutions to minimize project delays.
  • Increased client satisfaction by consistently delivering high-quality workmanship and addressing concerns promptly.
  • Verified completed projects met approved time, quality, and cost estimates.
  • Developed strong relationships with subcontractors, leading to efficient collaboration on complex construction projects.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
  • Managed procurement processes for timely delivery of materials while minimizing costs, ensuring smooth project execution.
  • Planned and implemented comprehensive construction schedule to guarantee completion of project on time and within budget.
  • Negotiated contracts with suppliers and subcontractors to confirm fair pricing and quality service.
  • Collaborated with contractors, architects, engineers, and public agencies to complete projects within timeline limitations and budget constraints.
  • Mentored junior staff members in various aspects of construction management, fostering professional growth within the team.
  • Contributed innovative ideas during design phase discussions that led to cost-effective solutions while maintaining desired aesthetic appeal.

HVAC Company Partner

Vibraled Inversiones
07.2017 - 11.2020
  • Provided outstanding service to all individuals, promoting effective, and lasting business relationships.
  • Achieved successful client outcomes by identifying and addressing their unique needs and goals.
  • Stayed informed on industry developments and market trends to gain competitive advantage.
  • Networked with other professionals and organizations to expand contacts and opportunities.
  • Negotiated contracts with partners to give equitable terms to all parties.
  • Spoke with peers to verify task completion, meeting tight deadlines, and schedules.
  • Coordinated cross-functional teams to provide comprehensive legal advice tailored to individual client situations.
  • Negotiated settlements, achieving mutually satisfactory resolutions for clients involved in disputes.
  • Prepared and presented reports on status of projects and initiatives.
  • Leveraged technological tools for efficient case management, organization, and enhanced client communication.
  • Oversaw firm's day-to-day administrative operations, provided guidance to support staff and enforced compliance with state, federal, and local regulations across organization.
  • Collaborated with colleagues and support staff to maximize team efficiency.

HVAC Projects Engineer

Primaterm
02.2015 - 06.2017
  • Streamlined communication channels between internal departments and external partners for efficient project coordination.
  • Partnered with sales representatives in the presentation of technical information at client meetings to facilitate informed decision-making processes surrounding proposed solutions.
  • Maintained up-to-date knowledge on industry trends, codes, regulations, and best practices to ensure compliance throughout project lifecycles.
  • Conducted post-project evaluations and client follow-ups to assess system performance, identify areas for improvement, and maintain strong client relationships.
  • Troubleshot complex issues related to HVAC systems during installation or post-project phases, delivering prompt resolutions that minimized downtime impacts.
  • Enhanced client satisfaction by providing technical support and addressing concerns promptly during project implementation phases.
  • Negotiated contracts with vendors and subcontractors to capitalize on cost-effective solutions without compromising quality or performance outcomes.
  • Collaborated with architects and construction teams to integrate seamless HVAC systems into building designs.
  • Improved HVAC system performance by conducting thorough evaluations and implementing design changes.
  • Leveraged data-driven decision-making processes to optimize HVAC design parameters for maximum efficiency gains.
  • Participated in professional development workshops and conferences to continuously expand technical expertise within the field of HVAC engineering.
  • Managed multiple HVAC projects simultaneously, ensuring timely completion and adherence to budget constraints.
  • Led cross-functional teams in the successful execution of complex HVAC projects, fostering a collaborative work environment.

Operation HVAC Manager

Kaltemp
06.2014 - 12.2014
  • Managed and motivated employees to be productive and engaged in work.
  • Accomplished multiple tasks within established timeframes.
  • Maintained professional, organized, and safe environment for employees and patrons.
  • Enhanced customer satisfaction by resolving disputes promptly, maintaining open lines of communication, and ensuring high-quality service delivery.
  • Resolved staff member conflicts, actively listening to concerns and finding appropriate middle ground.
  • Maximized performance by monitoring daily activities and mentoring team members.
  • Controlled costs to keep business operating within budget and increase profits.
  • Developed and maintained relationships with customers and suppliers through account development.
  • Monitored and analyzed business performance to identify areas of improvement and make necessary adjustments.
  • Improved safety procedures to create safe working conditions for workers.

Heating, Ventilation, and Air Conditioning Foreman

Empresa Kaltemp
12.2006 - 06.2014
  • Filled out detailed work orders for each job completed.
  • Investigated major malfunctions and breakdowns of heating and air-conditioning systems and used troubleshooting to determine causes.
  • Kept accurate records of time and materials used for each job to compile into service reports.
  • Closed out work orders after verifying completion with customers and reporting discrepancies discovered on job site.
  • Reviewed work of external and internal contractors to guarantee consistency with quality and safety standards.
  • Streamlined project management, coordinating with contractors and suppliers to ensure smooth installations.
  • Enhanced customer satisfaction by providing timely and effective maintenance and repair services.
  • Increased team productivity by providing training and guidance to junior technicians on industry best practices.
  • Achieved significant energy savings for clients through retrofitting older systems with modern components.
  • Maintained client relationships, addressing concerns promptly and offering expert advice on system maintenance.
  • Facilitated a safe working environment, ensuring all personnel were aware of potential hazards associated with HVAC projects.
  • Ensured safety compliance, conducting regular equipment checks and adhering to industry regulations.
  • Optimized airflow in commercial buildings through proper ductwork design and installation.
  • Minimized downtime during installations by efficiently coordinating work phases among team members.

Heating Equipment Sales Executive

Empresa Anwo S.A.
06.2005 - 03.2006
  • Collaborated with back-office team members to facilitate seamless business execution.
  • Enhanced customer satisfaction by streamlining communication channels and improving response times.
  • Conducted regular meetings with team to discuss issues, concerns and updates.
  • Increased revenue through effective negotiation of contracts with clients and suppliers.
  • Mentored junior staff members for accelerated career growth, developing future leaders within the organization.

Refrigeration Plant Operator Assistant

Geofrut
01.2002 - 03.2002
  • Maintained a safe working environment by adhering to safety protocols and conducting regular inspections.
  • Followed plant safety procedures, rules, and regulations.
  • Adjusted and maintained plant equipment for safety and performance.

Education

Refrigeration,Air Conditioning-Heating Engineering - Engineering (Pre-Engineering)

Inacap
Santiago, Chile
12.2005

Skills

  • Air Conditioning
  • Training and mentoring
  • Plumbing Design
  • Heating Systems
  • HVAC Controls
  • Refrigeration Systems
  • HVAC system design
  • Indoor Air Quality
  • Equipment Selection
  • Cost Estimation
  • Ventilation Systems
  • Ductwork Design
  • Energy conservation

Academic Background

Colegio Instituto Ingles, Rancagua, Colegio Instituto Ingles, Rancagua, Ingeniería en Construcción, Universidad Central de Chile, 3 años, Ingeniería en Refrigeración y Climatización Industrial, Inacap, 4 años

Work Experience

  • Enero 2002 – Marzo 2002, Asistente operador planta frigorífica, Geofrut, Rengo
  • Junio 2005 – Marzo 2006, Ejecutivo de ventas, Empresa Anwo S.A.
  • Diciembre 2006 – Junio 2014, Supervisor de instalaciones de calefacción, extracción de aire, aire acondicionado, sistema paneles solares, entre otros, Empresa Kaltemp
  • Junio 2014 – Diciembre 2014, Gerente Operaciones, Kaltemp
  • Febrero 2015 – Junio 2017, Gerente Operaciones, Primaterm SPA
  • Julio 2017 – Noviembre 2020, Socio en Inversiones Vibraled Ltda, área Climatizacion, Independiente
  • Diciembre 2020 – Julio 2021, Administrador obras Climatización, Farenhouse Energy Group
  • Agosto 2021 a la fecha, Gerente Operaciones, Inversiones Vibraled Ltda., área Climatización

Fecha Actualizacion

04/04/24

Personal Information

Fernando José Möller Roth, 13.550.394-0, 44 Años, Chileno, Casado, Santa Rita 831, Las Condes, Santiago, +569-92996738

Languages

Spanish
Bilingual or Proficient (C2)
English
Upper intermediate (B2)

Timeline

Senior HVAC Engineer and Partner

Vibraled Inversiones
08.2021 - Current

HVAC Construction Manager

Farenhouse Energy Group
12.2020 - 07.2021

HVAC Company Partner

Vibraled Inversiones
07.2017 - 11.2020

HVAC Projects Engineer

Primaterm
02.2015 - 06.2017

Operation HVAC Manager

Kaltemp
06.2014 - 12.2014

Heating, Ventilation, and Air Conditioning Foreman

Empresa Kaltemp
12.2006 - 06.2014

Heating Equipment Sales Executive

Empresa Anwo S.A.
06.2005 - 03.2006

Refrigeration Plant Operator Assistant

Geofrut
01.2002 - 03.2002

Refrigeration,Air Conditioning-Heating Engineering - Engineering (Pre-Engineering)

Inacap
Fernando José Möller Roth